{"id":4991,"date":"2024-09-26T14:09:03","date_gmt":"2024-09-26T06:09:03","guid":{"rendered":"https:\/\/courageous-peach-squirrel.62-72-47-242.cpanel.site\/cagayan-de-oro-lab-boosts-renewable-energy-prospects-in-mindanao\/"},"modified":"2024-09-26T14:09:03","modified_gmt":"2024-09-26T06:09:03","slug":"cagayan-de-oro-lab-boosts-renewable-energy-prospects-in-mindanao","status":"publish","type":"post","link":"https:\/\/greeninc.ph\/cagayan-de-oro-lab-boosts-renewable-energy-prospects-in-mindanao\/","title":{"rendered":"Cagayan De Oro Lab Boosts Renewable Energy Prospects In Mindanao"},"content":{"rendered":"<p>A newly launched research facility here is poised to accelerate renewable energy (RE) development in Mindanao, particularly in waste-to-energy technologies.<\/p>\n<p>The Department of Science and Technology (DOST), in collaboration with Xavier University-Ateneo de Cagayan (XU), opened the PHP278-million &#8220;Green BioH2E&#8221; Research and Development (R&amp;D) Laboratory on Wednesday. The lab, located at XU\u2019s College of Engineering (COE), is funded by DOST\u2019s Philippine Council for Industry, Energy, and Emerging Technology Research and Development (PCIEERD).<\/p>\n<p>Dr. Shierlyn Paclijan, project leader, said the lab will explore the feasibility of converting waste into energy, with the long-term goal of reducing energy costs for local industries.<\/p>\n<p>\u201cThis technology, if viable, can lower utility rates and production costs, making local goods more affordable,\u201d Paclijan said, adding that discussions are underway with the City Local Environment Resources Office to gather wastewater for energy conversion.<\/p>\n<p>The lab\u2019s pilot projects are expected to lay the groundwork for industries to adopt the technology, with a focus on making renewable energy accessible and sustainable for Northern Mindanao.<\/p>\n<p>XU-COE Dean Dr. Hercules Cascon said the lab will serve as a benchmark for the region\u2019s renewable energy efforts, starting from small-scale concepts to full-scale industrial applications.<\/p>\n<p>The new facility is part of Mindanao\u2019s broader push towards a 50:50 renewable energy-to-fossil fuel ratio by 2030, a target set by the Mindanao Renewable Energy Acceleration and Coordination Hub.<\/p>\n<p>Currently, fossil fuels still supply 69% of Mindanao\u2019s energy needs, with coal being the primary source. (PNA)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cagayan de Oro\u2019s lab is paving the way for renewable energy progress in Mindanao with a focus on waste-to-energy innovations.<\/p>\n","protected":false},"author":1,"featured_media":4992,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35],"tags":[],"class_list":["post-4991","post","type-post","status-publish","format-standard","has-post-thumbnail","category-energy"],"zyndk8_nxtgen_metadata":[],"_links":{"self":[{"href":"https:\/\/greeninc.ph\/wp-json\/wp\/v2\/posts\/4991","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/greeninc.ph\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/greeninc.ph\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/greeninc.ph\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/greeninc.ph\/wp-json\/wp\/v2\/comments?post=4991"}],"version-history":[{"count":0,"href":"https:\/\/greeninc.ph\/wp-json\/wp\/v2\/posts\/4991\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/greeninc.ph\/wp-json\/wp\/v2\/media\/4992"}],"wp:attachment":[{"href":"https:\/\/greeninc.ph\/wp-json\/wp\/v2\/media?parent=4991"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/greeninc.ph\/wp-json\/wp\/v2\/categories?post=4991"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/greeninc.ph\/wp-json\/wp\/v2\/tags?post=4991"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}